The Helix was a metal/wood construction in a free elliptical shape. It rose at 6%, spanned the Towers and reached the 12.00 metre high Bridge (ship passage) after 220.00 metres. The maximum pile load of 50 tonnes was decisive for the column width. For cost reasons, the Helix was not supported with individual piles, but with scaffolding directly on the Forum. Consequently, individual zones were closed to the public so as not to exceed the total load.
Arteplage
Biel-Bienne
Product / service / infrastructure and media partners (PSIM partners)
Orange Communications
Photos: © Yves André www.yves-andre.ch; © Günter Rühle; © Philipp Zanatta; © Andreas Mosimann; © Trudy Hebeisen; © Joël Joliat; © Christoph Steudler; © Eugen von Arb; © Tom Weilenmann; © Norbert Aepli Lizenz https://creativecommons.org/licenses/by/2.5/deed.de; © Hugo Keller; © VierNullVier; © Claude & Dominique Wacker-Cao; © Joseph Tame - CC BY-NC-ND 2.0; © Familie Kartas, Hallwil